Process
Flow Process- Die & Mould
Sr. No | Particular | Sequence of Activity |
1 | Quote to customer of his Inquiry as per his requirement | Quotation |
2 | Drawing Sample and order with Schedule are Received from Customer | Order / Planning |
3 | Job card release/Whole Designing And detail designing and preparing parts drawing | Design / Release |
4 | Order to vendor for raw material requirement or order to customer for arrange | Raw Material Order |
5 | Received raw Material(casting or bar or block) from customer / outside vender source | Raw Material Inward |
6 | Checked raw goods and if require prepare pre-machining drawing | Inspection |
7 | Send it to vendor or in-house conventional shop for pre-machining/part making with drawing | Pre-machining (Conventional Shop) |
8 | Received it to VMC/CNC shop and checked pre-machining dimension | CNC Shop / Inspection |
9 | Prepare programme and inspection report with set up sheet and clamping | Programming/Setting |
10 | Inspect during machining after each programme | In process Inspection |
11 | After completed VMC/CNC process send it for final inspection | Inspection |
12 | Send it to conventional shop for Assembly(all part from VMC and conventional and readymade) | Assembly |
13 | After Assembly completed polished goods | Polishing |
14 | After polishing and Assembly inspect all thoroughly | Inspection |
15 | If require, trial all Assembly | Trial |
16 | Packing in boxes for Dispatch | Packing |
17 | Dispatch with required Documents | Dispatch |
Flow Process-Machinery Components
Sr. No | Particular | Sequence of Activity |
---|---|---|
1 | Quote to customer of his Inquiry as per his Requirement | Quotation |
2 | Drawing Sample and order with Schedule are Received from Customer | Order / Planning |
3 | Received raw Material(casting or bar or block) from customer / outside vender source | Raw Material Inward |
4 | Prepare Job card & Checked raw goods and if require prepare pre-machining drawing | Schedule / Designing |
5 | Send it to vendor or in-house conventional shop for pre-machining with drawing | Pre-Machining (Conventional Shop) |
6 | Received it to CNC shop and checked pre-machining dimension | Ready for CNC shop/Inspection |
7 | Prepare programme and inspection report for production as per job card | Programming/Setting |
8 | First piece checked thoroughly after trial and before start production | Trial/Inspection |
9 | After completed CNC process send it for final inspection | Inspection |
10 | Send it to VMC shop(Vendor) if its require | VMC/Milling process |
11 | After VMC completed deburred(polished) goods send it for hole and tapping | Hole/Tapping |
12 | Hole And Tapping Done By Using Jigs And Fixture As Per Require Quality | Hole/Tapping |
13 | After Finished All Operation, Polished And Cleaning And Deburred All Components | Polishing/cleaning |
14 | Final Inspection Report Fill Up And Checked | Final Inspection |
15 | Packing in Boxes for Dispatch | Packing |
16 | Dispatch with required Documents | Dispatch |